Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make.
Hanging sheetrock on cement wall.
Drywall is usually attached to wall studs with 2 inch drywall screws using an electric drill with a driver bit installed.
Step 3 apply primer to the sheetrock.
How to hang drywall on block walls.
Hanging stuff on a cement wall is simple with the right supplies.
Brick hooks and command strips make the job as easy as hanging stuff on drywall.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
The strips usually run vertically along the wall.
Apply a coat of primer sealant to the wall.
Next take the tile adhesive thinset mortar and apply it to the drywall with a trowel.
Add some rigid board insulation between the hat.
In lieu of using screw anchors you can adhere the furring strips to the wall with concrete screws.
However in some installations such as in a basement it is necessary to glue drywall sheets to the interior of concrete block walls.
Hanging drywall on concrete block walls requires the use of furring strips.
The hat channel image 1 should be attached to the wall using concrete nails and concrete nail gun images 2 and 3.
Frame out the rest of the wall by adding faux top and sole plates dropping the top a bit for a drop ceiling if.
Roll it onto the surface evenly to avoid drips that might cause the tiles to hang strangely.
The drywall can then be attached to the strips.
First draw a plumb line to make sure the hat channels will be spaced properly for the size of drywall and insulation you re using.
Step 4 place tile adhesive on the sheetrock.
Even in so called finished basements.
Cement block walls are common particularly for basement construction and garages but they lack warmth or personality.
Best way to hang drywall on concrete wall.
Drill a pilot hole for each screw in the wall that is the same diameter as the screws you re.
As email protected says fir out studs with 1x2 s when you get to the concrete tapcon them to the wall then put 3 4 foam between the 1x2 s on concrete sheetrock as usual no mr board needed.